9 de December de 2019

New Tapa Tapa restaurant at Barcelona-El Prat Airport, built by 4Retail

December 2019-. 4Retail construction company, a benchmark in projects for the travel retail sector, was commissioned to carry out the building project for the new Tapa Tapa restaurant, part of the Eat Out Group, located in terminal 1 of the Barcelona-El Prat Airport.

In just two months, the expert team at 4Retail completed all the works for the civil works project, joinery, finishes, installations, and kitchen for the new restaurant, which has more than 322 square metres of space.

It is the first location of the pioneer tapas restaurant in Barcelona and Madrid, Tapa Tapa, that the Travel Division of the Eat Out Group, which belongs to the Ibersol Group, has opened in an airport.

The interior design for the new restaurant features Mediterranean colours, with green and terracotta tiles combining perfectly with the black lights and furniture. The lavender plants dotted around the restaurant bring in a touch of freshness and naturalness.

“This restaurant is a milestone for our client, Eat Out Group, as it is the first in this brand, Tapa Tapa, to open in an airport. For 4Retail, it’s great to be part of this project, which we expect to be a great success,” says Javier Paradell, co-founder and partner at 4Retail.